Hit enter to search or ESC to close
I’ve watched crews lose hours to wobbly channels and off-spec tracks. Then I ran into the Ud System coming out of Dongdu Industrial Park, Huangfu Farm, Langfang, Hebei. It’s a CD/UD drywall ceiling setup—straightforward on paper, surprisingly robust on site. To be honest, that combo (CD main profile + UD perimeter track) has become the quiet backbone of many retail, hospitality, and healthcare fit-outs lately.


| Parameter | CD Profile (Main) | UD Profile (Perimeter) |
|---|---|---|
| Material | Galvanized steel (DX51D+Z or equiv.), yield ≈ 280–350 MPa | |
| Thickness (t) | 0.5–0.6 mm (typ.) | 0.4–0.5 mm (typ.) |
| Zinc coat | Z140–Z275 g/m² (project-driven) | |
| Length | 3.0 m standard; cut-to-length available | |
| Compliance | EN 14195, ASTM C645; install per ASTM C754; A1 non-combustible (steel) | |

Process flow: galvanized coil → roll-forming dies (tight tolerances) → punching/slotting (if specified) → deburr → dimensional check → packing. Methods follow EN 14195 dimensional tolerances and in-house jigs for straightness. Testing: tensile/yield checks, zinc weight verification, and salt-spray spot checks (≈ 240 h per ISO 9227, project-dependent). Service life: ≈ 25–35 years in interior C1–C2 environments, assuming normal humidity and proper board/fastener practice.

Advantages? Crews say the perimeter UD channels seat squarely, and CD-to-hanger connection feels “click-in solid.” I guess that’s what you want when schedules squeeze.

| Vendor | Origin | Certs | Zinc (typ.) | Lead time |
|---|---|---|---|---|
| JinKai BM (Ud System) | Langfang, Hebei | ISO 9001; CE DoP | Z140–Z275 | 7–15 days |
| Trading House A | Mixed OEM | Varies | Z100–Z140 | 15–30 days |
| Budget Factory B | Domestic | Limited | Z80–Z120 | 10–25 days |

Options: thickness tuning (0.4–0.8 mm), zinc upgrades for coastal interiors, cut-to-length, perforations for services, plus hangers, anchor bolts, and self-drill screws. Submittals typically include mill certs, dimensional reports, and a conformity sheet to EN 14195/ASTM C645.

Retail chain, Guangzhou: 4,800 m² ceilings. Crew reported ≈ 12% faster install versus prior brand; fewer re-level passes. Deflection under service load stayed within L/360.
Clinic upgrade, Shijiazhuang: acoustic spec with 2-layer boards. Using Ud System + resilient hangers, corridor NC levels dropped by ~3–4 points, per GC meter readings (informal but consistent).

Authoritative citations
May 06, 26
Guide to Global Light Gauge Steel Truss Prices and Trends
May 04, 26
Premium Metal Decorative Truss Solutions
May 01, 26
Comprehensive Guide to Light Steel Frame Building Costs
If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.
